Precautions when signing decoration contract

2022-07-22
  • Detail

The signing of the decoration contract is not a trivial matter, so the editor reminds you that you must pay attention to the following aspects when signing the contract: first, the construction period is generally agreed to be about 35 days for a room with 2 bedrooms and 100 square meters. For simple decoration, the construction period is generally agreed to be 45-50 days by the decoration company for insurance. If you are in a hurry to move in, you can discuss this clause with the designer when signing the contract. 2、 The general way of payment is the decoration contract, which stipulates that the down payment is 60%, and the woodworking inspection

the signing of the decoration contract is not a trivial matter, so the editor reminds you that you must pay attention to the following aspects when signing the contract:

first, the construction period agreement

generally, the construction period of a two bedroom 100 square meter room is about 35 days for simple decoration. For insurance, the decoration company will generally agree the construction period to 45-50 days. If you are anxious to check in, you can discuss this clause with the designer when signing the contract

II. Payment method

general decoration contract, agreed to pay 60% down payment, 35% after woodworking acceptance, and 5% after completion. If you follow this form of payment, you will have paid about 95% of the cost to the decoration company after about half of the construction period. If there is any problem in the later stage of decoration, it is difficult to restrict the decoration company in terms of money. Therefore, it is suggested that when signing the contract, the down payment should be reduced to 30% and the interim payment should be 30%

III. interim payment

the interim payment time agreed in the general contract is simply marked as "more than half of the project, woodworking is closed". However, a construction site is often multi project cross operation, and more than half of the formal construction period should be: the completion of woodwork production; Kitchen and bathroom walls, floor tiles and ceilings are finished; End of wall leveling; The electric transformation is over

IV. increase or decrease items

during the decoration process, it is easy to increase or decrease items, such as making more cabinets, changing more water circuits for several meters, etc. These fees should be paid at the time of completion. How much should the unit price of these items be? If we wait until the construction has started, it may be the design. Therefore, if possible, it is best to copy a complete quotation originally shown to you by the decoration company, so as to avoid the decoration company changing the price when signing the contract or increasing or decreasing the project

also note that when you finally settle the expenses, the increase and decrease expenses you should pay should be signed and approved by you before the construction of the project. If you do not sign and approve, you can not pay the corresponding expenses at all.

v. warranty terms

the whole process of decoration is now mainly manual on-site production, not fully industrialized, Therefore, there will inevitably be various fine quality problems. Within the warranty period, the responsibility that decoration companies should implement is particularly important. For example, if something goes wrong, whether the decoration company is fully responsible for the warranty of labor and materials, or only labor and not responsible for the warranty of materials, or there are other restrictive clauses, these must be clearly written in the contract

VI. water and electricity cost

during the decoration process, water, electricity, gas, etc. will be used for on-site construction. Generally, by the end of the project, the water and electricity charges add up to a large number. Who should pay this cost should also be indicated in the contract

VII. Construct according to the drawings

construct in strict accordance with the drawings signed and approved by you. If the details and dimensions are inconsistent with your design drawings, you can request rework

VIII. Time and frequency of supervision and quality inspection

general decoration companies assign the project to each construction team to complete. Quality inspection personnel and supervision are the most important means of supervision for decoration companies. The time interval of their on-site inspection is particularly important to the quality of the project. Supervisors and quality inspectors should be present every two days. The design should also be present once every 3-5 days to see whether the on-site construction results are consistent with their own design